Topic ID | Description |
---|---|
Added Replace Relays. | |
Updated phone number in Continued Operational Safety Reporting | |
Updated Consumables list in Replace Side Window Seal | |
Updated steps in Rigging
Roll Controls | |
Updated torque value of Step 38 in Install
Engine | |
Updated steps in Install
Coolant Radiator | |
Added Remove Tailpipe Bezel | |
Added Install Tailpipe Bezel | |
Added Patch Insulation | |
Move Remove
Engine Cowlings from Propulsion to Fuselage and Vertical Tail and update the Aircraft System and Number to be consistent with the ICON Illustrated Parts Catalogue (IPC) | |
Move Install
Engine Cowlings from Propulsion to Fuselage and Vertical Tail and update the Aircraft System and Number to be consistent with the ICON Illustrated Parts Catalogue (IPC) | |
Added G3X and Autopilot Configuration Only inspections to Condition and 100-Hour Inspection—Avionics
and Electrical | |
Updated Battery Description | |
Updated Charge
Battery | |
Updated Parts Required information in Battery
Removal and Installation—Configuration
A | |
Updated Parts Required information in Install
Aircraft Battery—Configuration B |