Installation of IPS Egress Panel
100713-02
Use the following procedure to install the IPS Egress Panel.
Applicable Aircraft Serial Numbers
All
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
16—ICON Parachute System (IPS)
Safety Equipment
As Needed
Consumables
3M Fire Barrier 2000+
Masking Tape
Mineral Spirits
Task Instructions
2. Bond IPS Egress Panel to Upper Center Wing Skin.
a. Mask the perimeter of IPS egress panel with masking tape and popsicle sticks. The Popsicle sticks will be used as layout guides in a future step. Prep all faying bond surface areas on the aircraft AND on the IPS egress panel (highlighted in yellow).
b. Scuff with 180 grit sandpaper. The abrasion should only remove surface gloss and not cut into the laminate in any way. Wipe clean with mineral spirits and wipe dry with a clean cloth.
Warning:
When using mineral spirits, ensure work area is well ventilated and located near an emergency eye wash station. Wear the following PPE: Safety glasses with side shields or chemical goggles; Chemical resistant gloves (nitrile or equivalent).
CAUTION:
Do not clean with isopropyl alcohol.
c. Ensure the surface is dry before bonding.
d. Apply a continuous bead of FIRE BARRIER 2000PLUS sealant to bond area. The sealant should not squeeze out into the bond gap area.
Note:
Do not over-apply adhesive to ensure adhesive does not contact the parachute or rocket components.
e. Install IPS Egress Panel ensuring an equal bond gap along the perimeter of the Panel. Secure popsicle sticks to the Aircraft using masking tape. Secure weight bags using masking tape as shown.
f. Allow adhesive to cure for 24 hours.
g. After initial panel bonding is cured, remove all masking tape and popsicle sticks from panel and aircraft. Backfill with additional adhesive as needed and allow to cure.
h. Clean area with isopropyl alcohol.
Figure 522. Egress Panel Bonding
Figure 523. Egress Panel Prep
Figure 524. Egress Panel Bonding
Figure 525. Final Step
Verification Method:
If applicable, check-off BRS Checklist PS.19. (
IPS Installation
Checklist) Ensure the BRS installation checklist is completed and proper photo documentation is completed and provided to ICON.
Parent topic
Related tasks
Related references